Back to the lab today after our first lab-group fieldwork. Costa Rica was a logistical dream, as usual. We set up 6 FITs, and did 24 berleses from sifted litter. A number of river and stream collections were made, as well as numerous other hand collections, including two entire ant-nest excavations. Now the real work begins.
Thursday, March 25, 2010
Subscribe to:
Post Comments (Atom)
I look forward to seeing those histerids!
ReplyDelete